Verbs term consists of two Solidity/full-stack engineers (Elad and David) who executed Proposal 4 and are on the tail end of a 3 month engagement with the Tech Pod (Proposal 54). In the last ~2 (of 3) months engagement the team has conducted R&D, implemented, and tested significant improvements to the Nouns protocol such as dynamic quorum (https://github.com/nounsDAO/nouns-monorepo/pull/438) and descriptor v2 (https://github.com/nounsDAO/nouns-monorepo/pull/499).
Based on the success of this trial engagement, the Tech Pod and Verbs teams want to re-engage on a 6 month contract with updated terms.
Verbs term consists of two Solidity/full-stack engineers (Elad and David) who executed Proposal 4 and are on the tail end of a 3 month engagement with the Tech Pod (Proposal 54). In the last ~2 (of 3) months engagement the team has conducted R&D, implemented, and tested significant improvements to the Nouns protocol such as dynamic quorum (https://github.com/nounsDAO/nouns-monorepo/pull/438) and descriptor v2 (https://github.com/nounsDAO/nouns-monorepo/pull/499).
Based on the success of this trial engagement, the Tech Pod and Verbs teams want to re-engage on a 6 month contract with updated terms.